17.1.5 PROCESS PLANT DESCRIPTIONPRIMARY CRUSHING (UNDERGROUND)The primary crushing facility with an average process rate of 173 t/h will be locatedunderground. A jaw crusher is proposed for primary crushing.The major equipment <strong>and</strong> facilities for the underground primary crushing facility include:• a hydraulic rock breaker• a stationary grizzly• a jaw crusher (160 kW)• a vibrating grizzly feeder• associated dump pocket <strong>and</strong> belt conveyor• belt scales• a dust collection system.The run-of-mine (ROM) material will be trucked from the underground mine to theunderground primary crushing facility. The particle size of the jaw crusher feed will beless than 500 mm. The jaw crusher will reduce the ROM material to 80% passing 120 to150 mm. A rock breaker will be installed to break any oversize rocks.The crusher product will be transported by a conveyor system from the undergroundprimary crushing facility to the SAG mill feed surge bin located on surface. The primarycrushing <strong>and</strong> conveying facilities will be equipped with a dust collection system to controlfugitive dust generated during crushing <strong>and</strong> conveyor loading. The crushing <strong>and</strong>conveying system will be monitored by closed-circuit television (CCTV) <strong>and</strong> can becontrolled from the process central control room, located in the process plant.MILL FEED SURGE BINThe SAG mill feed surge bin is designed to have a live capacity of 2,500 t. The crushedproduct from the underground primary crushing facility will be conveyed to the transfertower <strong>and</strong> then further transported to the SAG mill feed surge bin. The transfer tower,which is part of the process/administration/truck shop complex, will receive the crushedmaterial from the underground primary crushing facility <strong>and</strong> transfer the ore onto thesurge feed conveyor.The ore from the mill feed surge bin will be reclaimed by four belt feeders onto the SAGmill feed conveyor at a nominal rate of 122 t/h.The stocking <strong>and</strong> re-h<strong>and</strong>ling system for the crushed ore will include:• a 1,150 mm wide jaw crusher discharge belt conveyor• a transfer tower located at the surfacePretium Resources Inc. 17-6 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!