solution strength. The solution will be stored a holding tank prior to being pumped bymetering pumps to the thickener feed wells.Anti-scalant chemicals will be delivered in liquid form <strong>and</strong> added to the process watertank as required to minimize scale build-up in the water pipelines <strong>and</strong> processequipment. This reagent will be added in undiluted form.A mixing, holding, <strong>and</strong> dosing system will be provided to occasionally test any newreagents that may improve the metallurgical performance for better metal recovery.These reagents will be h<strong>and</strong>led in accordance with Material Safety Data Sheet (MSDS)requirements, <strong>and</strong> any unused test reagents will be returned to the suppliers for disposal.To ensure containment in the event of an accidental spill, the reagent preparation <strong>and</strong>storage facility will be located within a containment area designed to accommodate110% of the content of the largest tank. The storage tanks will be equipped with levelindicators <strong>and</strong> instrumentation to ensure that spills do not occur during normaloperation. Appropriate ventilation, fire <strong>and</strong> safety protection, <strong>and</strong> MSDS stations will beprovided in the area.Each reagent line <strong>and</strong> addition point will be labelled in accordance with WorkplaceHazardous Materials Information Systems (WHMIS) st<strong>and</strong>ards. All operational personnelwill receive WHMIS training, along with additional training for the safe h<strong>and</strong>ling <strong>and</strong> useof the reagents.ASSAY AND METALLURGICAL LABORATORYThe assay laboratory will be equipped with the necessary analytical instruments toprovide all routine assays for the mine, process plant, <strong>and</strong> the environmentaldepartment. The most important assay laboratory instruments include:• fire assay related furnaces <strong>and</strong> devices• one atomic absorption spectrophotometer (AAS)• two ICP, including one ICP-mass spectrometer (MS) for environmental sampleanalysis• one Leco furnace.The metallurgical laboratory will undertake all the necessary test work to monitormetallurgical performance <strong>and</strong>, more importantly, to improve process flowsheet unitoperations <strong>and</strong> efficiencies. The laboratory will be equipped with laboratory crushers <strong>and</strong>ball mills, particle size analysis sieves, bench scale flotation cells, centrifugal gravityconcentrators, leach units, filtering devices, balances, <strong>and</strong> pH meters. The personalprotection devices <strong>and</strong> items will be provided to protect the workers.WATER SUPPLYTwo separate water supply systems will be provided to support the operations for theprocess plant – one fresh water supply system, <strong>and</strong> one process water supply system.Pretium Resources Inc. 17-13 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!