13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

28.19 ALI FARAH, P.ENG.I, Ali Farah, P.Eng., of Vancouver, British Columbia, do hereby certify:• I am a Lead Mechanical Engineer with Tetra Tech WEI Inc. with a business address at#800 – 555 West Hastings Street, Vancouver, British Columbia, V6B 1M1.• This certificate applies to the technical report entitled <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong><strong>Report</strong> on the Brucejack Project, Stewart, BC, dated June 21, 2013 (the “<strong>Technical</strong><strong>Report</strong>”).• I am a graduate of Shiraz University (B.Sc.Eng. in Mechanical Engineering, 1984). I ama member in good st<strong>and</strong>ing of the Association of Professional Engineers <strong>and</strong>Geoscientists of British Columbia, License #144443. My relevant experience includes20 years of experience with hydraulic calculations, equipment design/selection <strong>and</strong>design of pumping systems. I am a “Qualified Person” for the purposes of NationalInstrument 43-101 (the “Instrument”).• I did not complete a personal inspection of the Property.• I am responsible for Sections 18.16 <strong>and</strong> 28.19 of the <strong>Technical</strong> <strong>Report</strong>.• I am independent of Pretium Resources Inc. as defined by Section 1.5 of theInstrument.• I have no prior involvement with the Property that is the subject of the <strong>Technical</strong> <strong>Report</strong>.• I have read the Instrument <strong>and</strong> the sections of the <strong>Technical</strong> <strong>Report</strong> that I amresponsible for has been prepared in compliance with the Instrument.• As of the date of this certificate, to the best of my knowledge, information <strong>and</strong> belief,the sections of the <strong>Technical</strong> <strong>Report</strong> that I am responsible for contains all scientific <strong>and</strong>technical information that is required to be disclosed to make the <strong>Technical</strong> <strong>Report</strong> notmisleading.Signed <strong>and</strong> dated this 25 th day of June, 2013 at Vancouver, British ColumbiaOriginal document signed <strong>and</strong> sealed byAli Farah, P.Eng.Ali Farah, P.Eng.Lead Mechanical EngineerTetra Tech WEI Inc.Pretium Resources Inc. 28-21 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!