13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Price, W. (2005). Mend <strong>Report</strong> 9.1c: Case Studies of ML/ARD Assessment <strong>and</strong>mitigation: Placement of the Sulphurets Waste Rock in Brucejack Lake. NaturalResources Canada. July, 2005.27.8.2 ACID ROCK DRAINAGE/METAL LEACHINGBGC Engineering Inc. 2013. Brucejack Project <strong>Feasibility</strong> <strong>Study</strong> – Geochemistry <strong>Report</strong>.Draft report in preparation for Pretium Resources Inc.27.9 MININGGhaffari, H., Huang, J, Pelletier, P., Armstrong, T., Brown, F.H., Newcomen, H.W.,Weatherly, H., Logue, C., Mokos, P. 2011: <strong>Technical</strong> <strong>Report</strong> <strong>and</strong> Preliminary EconomicAssessment of the Brucejack Project. NI43-101 <strong>Technical</strong> <strong>Report</strong> prepared forPretium Resources Inc., by Tetra Tech, Wardrop, P&E Mining Consultants Inc., BGCEngineering Inc., Rescan Environmental Services Ltd., AMC Mining Consultants(Canada) Ltd. 309pp. Effective Date 3 Jun 2011.Ghaffari, H., Huang, J., Hafez, S. A., Pelletier, P., Armstrong, T., Brown, F.H., Vallat, C.J.,Newcomen, H.W., Weatherly, H., Wilchek, L., Mokos, P. 2012: <strong>Technical</strong> <strong>Report</strong> <strong>and</strong>Updated Preliminary Economic Assessment of the Brucejack Project. NI43-101<strong>Technical</strong> <strong>Report</strong> prepared for Pretium Resources Inc., by Tetra Tech, Wardrop,Rescan Environmental Services Ltd., P&E Mining Consultants Inc., GeosparkConsulting Inc., BGC Engineering Inc., AMC Mining Consultants (Canada) Ltd. 328pp.Effective Date 20 Feb 2012.27.10 MINING GEOTECHNICALBieniawski, Z.T. 1976. Rock mass classification in rock engineering. In Exploration forrock engineering, proc. of the symp., (ed. Z.T. Bieniawski) 1, 97-106. Cape Town:Balkema.ERSi (Earth Resource Surveys Inc.), 2010. KSM Project Area Structural GeologyAssessment - Draft.Grimstad, E. <strong>and</strong> Barton, N., 1993. Updating of the Q-system for NMT. Proceedings ofthe International Symposium on Sprayed Concrete. Modern Use of Wet Mix SprayedConcrete for Underground Support, Fagemes. Norwegian Concrete Association, Oslo.Hudyma, M.R., 1988. Development of Empirical Rib Pillar Design Criterion for OpenStope Mining. M.A.Sc. Thesis, University of British Columbia.International Society for Rock Mechanics (ISRM), 1978. Suggested Method forQuantitative Description of Discontinuities in Rock Masses.Pretium Resources Inc. 27-3 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!