• portal fuel storage• conveyor portal <strong>and</strong> truck portal• overhead electrical• mill building including administration, mine dry, truck shop <strong>and</strong> warehouse• tailings pipeline• helipad• upper <strong>and</strong> lower laydown areas• batch plant, fuel storage, <strong>and</strong> aviation fuel tank• pre-production ore storage• diversion channel• waste rock transfer storage• garbage <strong>and</strong> incinerator area• operations camp• sewage system, water pumps, <strong>and</strong> storage tank• proposed new transmission tower location• scale house• four air raise locations• site access roads (not including mine access road).These facilities are located away from avalanche paths <strong>and</strong> areas, with the exception ofthe operations camp, some sections of the site access roads, <strong>and</strong> the pre-production orestorage <strong>and</strong> diversion channel area. Short slopes that currently exist (ranging from 10 to40 m in height) or will be created during construction, may be expected to affect otherfacility areas; however, the hazard <strong>and</strong> consequences would normally be assessed on asite-specific basis during construction <strong>and</strong> operations.Table 18.5 provides a summary of avalanches reaching the mine site area <strong>and</strong> Figure18.4 illustrates the approximate hazard locations.Pretium Resources Inc. 18-17 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!