13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 10.1Core in Wooden Core Boxes Ready for TransportFigure 10.2Sample Transportation by SnowcoachPrior to any geotechnical <strong>and</strong> geological logging, the entire drill core was photographed indetail using a digital camera. These images were stored in individual files per drillhole.A trained geotechnician recorded the core recovery <strong>and</strong> rock quality data for eachmeasured drill run. All lithological, structural, alteration, <strong>and</strong> mineralogical features ofthe drill core were observed <strong>and</strong> recorded during the geological logging.The geologist responsible for logging a drillhole assigned sample intervals with thecriteria that the intervals did not cross geologic contacts <strong>and</strong> the maximum sample lengthwas 2 m. Within any geologic unit, sample intervals of 1.5 m long could be extended orPretium Resources Inc. 10-3 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!