15.7 MINERAL RESERVESMineral reserves tabulated by zone <strong>and</strong> by reserve category are presented in Table 15.3.All mineral reserves are scheduled in the LOM plan, which is presented in Section 16.0.The mining blocks divide the mineral reserves into logical parcels consistent with themining sequence, <strong>and</strong> form the basis of the LOM development <strong>and</strong> production schedulediscussed in Section 16.0.Figure 15.3 illustrates the division of mineral reserves into lower, middle, <strong>and</strong> upperblocks in the VOK Zone. The West Zone is divided into lower <strong>and</strong> upper blocks as shownin Figure 15.4.Table 15.4 presents the mineral reserves by mining areas (blocks).Table 15.3Brucejack Mineral Reserves * by Zone <strong>and</strong> by Reserve CategoryZoneOreTonnes(Mt)Au(g/t)GradeAg(g/t)Au(Moz)MetalAg(Moz)VOK Zone Proven - - - - -Probable 15.1 13.6 11 6.6 5.3Total 15.1 13.6 11 6.6 5.3West Zone Proven 2.0 5.7 309 0.4 19.9Probable 1.8 5.8 172 0.3 10.1Total 3.8 5.8 243 0.7 30.0Total Mine Proven 2.0 5.7 309 0.4 19.9Probable 17.0 12.8 28 7.0 15.4Total 19.0 12.0 58 7.3 35.3Note:*Rounding of some figures may lead to minor discrepancies in totals. Based on Cdn$180/t cut-offgrade, US$1,350/oz gold price, US$22/oz silver price, Cdn$/US$ exchange rate = 1.0.Pretium Resources Inc. 15-9 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!