13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10.3 PRETIVM DRILLINGThe 2011 diamond drill program was the first in almost 20 years that was focusedspecifically on defining high-grade resources. In 2011, a total of 178 holes werecompleted totalling 72,805 m in holes SU-110 to SU-288. Included in this were 97 holes(41,219 m) targeted at VOK, 16 holes (7,471 m) at West Zone, <strong>and</strong> 21 holes (7,220 m)targeting the surrounding areas. The remaining drilling was focused on expansion ofShore Zone, testing for structurally controlled high-grade mineralization in Galena Hill(now part of VOK) <strong>and</strong> Bridge Zones, <strong>and</strong> testing new target areas. Drill collarcoordinates, <strong>and</strong> results of the drilling in 2011 are described by P&E in Ghaffari et al.(2012).The 2012 diamond drill program was focused on defining the high-grade resource atVOK, specifically targeting geological <strong>and</strong> structural features believed to be associatedwith gold mineralization. Diamond drilling was also focused on exp<strong>and</strong>ing VOK, both westof the Brucejack Fault <strong>and</strong> along trend to the east of the main mineralized zone. A totalof 301 drillholes (105,571 m) were competed in holes SU-289 to SU-589 as part of the2012 drilling program.In 2011 <strong>and</strong> 2012, the drilling contractors were Radius Drilling from Prince George BC,<strong>and</strong> Matrix Drilling from Kamloops BC. They both used Hydracore drill rigs.Core sizes for <strong>Pretivm</strong>’s surface collared drillholes are PQ (85 mm diameter), HQ(63.5 mm diameter) <strong>and</strong> NQ (47.6 mm diameter). Approximately 50 to 60% of core is HQsize. For drillholes less than 600 m length, core size is commenced at HQ <strong>and</strong> is reducedto NQ when conditions require. For drillholes greater than 600 m length, thecommencing core size is PQ, which is run down to approximately between 200 <strong>and</strong>300 m in order to minimize drill path deviation.Drill collars were surveyed by McElhanney Surveying from Terrace, BC. McElhanneySurveying use a total station instrument <strong>and</strong> permanent ground control stations forreference <strong>and</strong> have completed all the surveying on the project since 2009. Drillholepaths are surveyed at a nominal 50 m interval using a Reflex EZ single shot instrument.Drill core logging <strong>and</strong> h<strong>and</strong>ling procedures were the same for all three programs. At theend of each drill shift, all core were placed in wooden boxes (Figure 10.1), labelled bydrillhole <strong>and</strong> interval <strong>and</strong> transported to the core logging <strong>and</strong> core splitting facility on siteby snowcoach (Figure 10.2) or helicopter. The sample boxes were covered to avoidsample loss or contamination during transportation (Figure 10.2).Pretium Resources Inc. 10-2 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!