The total cost for Major Area 33 – Mine Site Facilities is $43.7 million.MAJOR AREA 34 – MINE SITE TAILINGSThe largest cost component in this area is the outlet control system at a cost of $3.3million.The total cost for Major Area 34 – Mine Site Tailings is $3.5 million.MAJOR AREA 35 – MINE SITE TEMPORARY FACILITIESConstruction catering ($10.2 million) is the only item contained in this cost area.The total cost for Major Area 35 – Mine Site Temporary Facilities is $10.2 million.MAJOR AREA 36 – MINE SITE (SURFACE) MOBILE EQUIPMENTThe largest components in this area are four Foremost Husky 8 tracked vehicles at aquoted price of $1.5 million each, for a total cost of $6.0 million.The total cost for Major Area 36 – Mine Site (Surface) Mobile Equipment is $14.3 million.MAJOR AREA 61 – OFF-SITE INFRASTRUCTUREThe largest cost component in off-site infrastructure is the power transmission line at atotal cost of $46.1 million. The total cost for the Knipple Transfer Station (including thestation, services, utilities, <strong>and</strong> mobile equipment) is $11.1 million. The access road isestimated to cost $5.0 million. The airstrip is estimated to cost $4.9 million.The total cost for Major Area 61 – Off-site Infrastructure is $69.1 million.MAJOR AREA 91– INDIRECTSAll construction indirect costs, contractor indirect costs <strong>and</strong> costs for equipment requiredfor construction are estimated to be $61.7 million.Other cost components in this area are:• spares ($7.6 million)• initial fills ($2.2 million)• freight <strong>and</strong> logistics ($13.3 million)• commissioning <strong>and</strong> start-up ($6.1 million)• EPCM ($32.6 million)• vendors assistance ($1.7 million).The total costs for Major Area 91 – Indirect Costs is $125.0 million.Pretium Resources Inc. 21-8 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!