Table 16.10Mine Infrastructure Excavations – Ground Support RecommendationsAreaDimension(height x width (alongtrend) by length)(m)Trend/Plunge ofExcavationDesignFactorof Safety Lifespan SupportCap Magazine 3.05 by 6.1 by 3.05 152/21 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS(shotcrete only required if rehab will not be practical due to installed infrastructure).Crusher Chamber -Lower level(conveyor)Crusher Chamber -Upper level (truck)Electricians <strong>and</strong>Millwrights ShopFuel <strong>and</strong> LubeStationService Bay,Maintenance Bay,<strong>and</strong> Tire Bay18.1 by 14.2 by 9.4 057/01 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS.Cable bolts:Walls: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacingBack: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacing17.3 by 7.6 by 9.3 057/01 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.5 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS.Cable bolts:Walls: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacingBack: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacing5.5 by 16.2 by 5.5 270/01 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS(shotcrete only required if rehab will not be practical due to installed infrastructure).4.5 by 35 by 8.5 243/06 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS(shotcrete only required if rehab will not be practical due to installed infrastructure).Cable bolts:Back: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacing11.5 by 42 by 10.0 005/00 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS(shotcrete only required if rehab will not be practical due to installed infrastructure).Cable bolts:Walls: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacingBack: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacingtable continues…Pretium Resources Inc. 16-34 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the Brucejack Project, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!