PROCESS CONTROL AND INSTRUMENTATIONPlant ControlThe type of plant control system will be a distributed control system (DCS) that willprovide equipment interlocking, process monitoring <strong>and</strong> control functions, supervisorycontrol, <strong>and</strong> an expert control system. The DCS will generate production reports, providedata <strong>and</strong> malfunction analyses, <strong>and</strong> produce a log of all process upsets. All processalarms <strong>and</strong> events will be logged by the DCS.Operator interface to the DCS will be via programmable computer (PC) at operatorworkstations located in the following area control rooms:• underground crushing facility• process plant• paste backfill plant.The plant control room will be staffed by trained personnel 24 h/d.Using the operator workstations in the main process plant, it will be possible to monitorthe entire plant site process operations, view alarms, <strong>and</strong> control equipment within theplant. Supervisory workstations will be provided in the offices of the plant superintendent<strong>and</strong> the mill maintenance superintendent.Field instruments will be microprocessor-based “smart” type devices. Instruments will begrouped by process area, <strong>and</strong> wired to field instrument junction boxes for each respectivearea. Signal trunk cables will connect the field instrument junction boxes to DCSinput/output (I/O) cabinets.Intelligent-type motor control centres (MCCs) will be located in electrical roomsthroughout the plant. A serial interface to the DCS will facilitate the MCCs remoteoperation <strong>and</strong> monitoring.A fiber optic backbone will be installed throughout the plant site for site wideinfrastructure (i.e. telephone, internet, security, fire alarm, <strong>and</strong> control system).A dedicated security system will be installed with multiple CCTV cameras in the gold roomto monitor operations <strong>and</strong> security. The system will connect with the overall site securitymonitoring systems in the plant control room <strong>and</strong> the offices of the plant superintendent<strong>and</strong> security.Control PhilosophyPrimary Crushing Control SystemThe control system for the primary crushing facility in the underground mine will beconnected with the plant control room, which will have a PC workstation. The plantcontrol system, together with the underground control system, will monitor thePretium Resources Inc. 17-15 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!