13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• wildlife management• waste management• archaeological <strong>and</strong> heritage site protection.Two employees, on a rotational basis, will be required for environmental monitoringincluding:• federal MMER monitoring requirements• permit <strong>and</strong> license compliance monitoring• environmental effects monitoring• reclamation research <strong>and</strong> monitoring.<strong>Pretivm</strong>’s environmental staff, supported by specialist consultants, will also research <strong>and</strong>advise the Mine Manager on alternative mitigation strategies as part of the mine’sprocess of continual improvement. Outside laboratories will be required for someanalyses while more routine analyses will be done in-house, such as conventional watersample analysis. Resources will be required for ongoing equipment upgrades <strong>and</strong>replacement, specialized equipment procurement, helicopter support, <strong>and</strong> mitigation <strong>and</strong>reclamation research.20.1.4 ACID ROCK DRAINAGE/METAL LEACHINGBGC completed an assessment of the ARD/ML characteristics of waste materials (wasterock <strong>and</strong> tailings) that will be generated at the Property. This assessment was required todetermine if waste materials will generate ARD <strong>and</strong> cause ML, so that appropriate wastemanagement strategies can be developed for the site. The assessment included:• a review of drill core logs to select waste rock samples• static tests (acid base accounting (ABA) data <strong>and</strong> elemental analysis) on thecollected samples• kinetic tests (humidity cells <strong>and</strong> subaqueous columns) on the collected samples• analysis <strong>and</strong> reporting of the test results.The following sections provide a brief summary of the key components to the ARD/MLassessment. BGC (2013) describes an in-depth discussion of the Brucejack ARD/MLtesting program.ACID BASE ACCOUNTINGABA data are used to assess the neutralization potential ratio (NPR) of waste materials inorder to determine which materials are classified as PAG. Static tests were carried out in2011 (using 150 samples) <strong>and</strong> 2012 (using 241 samples) on material collected fromdrill cores across the Project site. In addition, ABA tests were conducted on flotationtailings samples generated from the VOK Zone <strong>and</strong> West Zone ore. A frequency analysisPretium Resources Inc. 20-9 1291990200-REP-R0012-02.1<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!