modular construction where possible to minimize cost <strong>and</strong> site construction. Thepreliminary design of the buildings took into consideration local climate <strong>and</strong> siteconditions.Tracked vehicles will be used to transport components across Knipple Glacier to site. Assuch, vehicle limitations on shipping sizes <strong>and</strong> weights were considered in the costestimation.PRE-ENGINEERED MILL BUILDINGThe mill building was designed as one large structure to minimize issues with high snowdrifts <strong>and</strong> snow removal between multiple buildings. This structure will include thefollowing infrastructure <strong>and</strong> equipment under one roof:• ore transfer tower <strong>and</strong> SAG mill feed bin• process equipment including grinding mills, flotation tanks, reagent storage,thickeners, <strong>and</strong> concentrate h<strong>and</strong>ling <strong>and</strong> load out• paste backfill plant• administration• mine dry• truck shop• emergency response vehicles <strong>and</strong> first aid• warehouse• assay <strong>and</strong> metallurgical laboratories• wicket room for underground.Budget prices received from bidders included the building envelope only. Three buildingswill be constructed with a structural steel frame, steel girts <strong>and</strong> purlins, <strong>and</strong> intermediatestructural members. The walls <strong>and</strong> roof will be constructed of insulated metal panels.The envelope package comes complete with doors <strong>and</strong> all other envelope-related itemssuch as man doors, overhead doors, canopies, etc. High-bay lighting will also be includedwhere applicable.MODULAR BUILDINGSThe new additional permanent camp (330 person capacity) <strong>and</strong> the scale house will beconstructed using modular building design. Each building will include heating,ventilation, <strong>and</strong> air-conditioning (HVAC), electrical, piping, <strong>and</strong> fire detection <strong>and</strong>suppression systems ready to be connected to the site utilities. The modules will beconstructed of wood framing with insulated metal clad walls <strong>and</strong> roof. Once the modulesare in place <strong>and</strong> connected together, the complex will be weather tight. Roofs will bedesigned to minimize snow accumulation.Pretium Resources Inc. 18-29 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!