13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The VOK Zone <strong>and</strong> West Zone mining areas will be supplied with fresh air from aconnection to the twin declines <strong>and</strong> each area will have at least one exhaust return airraise (RAR) to surface.The underground crusher <strong>and</strong> workshop will have a dedicated RAR to prevent theintroduction of dust <strong>and</strong> other contaminants into production areas. The volume of airflowing through the crusher <strong>and</strong> workshop areas will be controlled with a combination offans <strong>and</strong> regulation.Figure 16.16 shows an isometric view of the Brucejack ventilation system.Figure 16.16Brucejack Ventilation System – Looking West16.8.1 TOTAL AIRFLOW REQUIREMENTSAir flow requirements were determined based on the diesel engine exhaust (DEE) dilutionprovided at point of use for the number of required mining areas. An airflow allowancewas also determined for underground infrastructure, leakage, <strong>and</strong> balancinginefficiencies.Total airflow requirements were determined based on the anticipated concurrentactivities during steady state production <strong>and</strong> development. The following activities areanticipated at the Property:Pretium Resources Inc. 16-45 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!