13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 12.1St<strong>and</strong>ard VerificationIDSnowdenAuSnowdenAg<strong>Pretivm</strong>Au<strong>Pretivm</strong>AgNominalAuNominalAgA 10.65 283 9.97 275 9.97±0.58 276.0 ± 17.1B 0.86 40.3 0.87 39.3 0.87±0.09 39.3 ± 4.6The comparison between the grade in the samples collected by Snowden <strong>and</strong> <strong>Pretivm</strong> areshown in Figure 12.3 <strong>and</strong> Figure 12.4.Figure 12.3Sample Verification Results for Gold GradesBrucejack PropertySnowden sample validation, June 2012Au g/t10.80.60.40.20L602569L602571L605214L605215M515283M515284N348071N348072N360192N360193N360355N360356Sample IDSnowden Au<strong>Pretivm</strong> AuPretium Resources Inc. 12-4 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!