13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 16.33Paste Fill Distribution System Schematic Showing Paste Pumping Zones16.10.3 DISTRIBUTION SYSTEM LAYOUTThe underground perspective view of the paste fill distribution system is provided inFigure 16.34.Key points of the piping strategy are:• one pump plus installed spare at the pastefill plant• one booster pump plus installed spare near the crusher station, 1,300 Level• main distribution pipeline in the conveyor decline• paste access drift off the conveyor ramp on the West Zone 1,370 Level• two sumps to divert paste from the pipeline during operation upsets.Pretium Resources Inc. 16-73 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!