Figure 16.3VOK Zone Sublevel Arrangement – Long SectionLevel development will follow the general strike of the various lenses, providing access tothe mineralized zones in a manner that promotes transverse mining wherever possible.Level development will generally be in the hanging wall, with hanging wall drives typicallyincluding excavations for sumps, refuges, transformers, remucks, paste fill line, <strong>and</strong> raiseaccesses.Stope access crosscuts will be on 15 m spacings, with the exception of those levelswhere sill extraction or near-surface weathered ore will be recovered in smaller units thatare designed on 10 m spacings. Figure 16.4 illustrates typical level developmentrequirements.Pretium Resources Inc. 16-5 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!