Fresh Water Supply SystemFresh water will be supplied to a fresh/fire water storage tank from the water treatmentplant or from Brucejack Lake. Fresh water will primarily be used for:• fire water for emergency use• cooling water for mill motors <strong>and</strong> mill lubrication systems• gl<strong>and</strong> water for the slurry pumps• reagent make-up• process water make-up.The fresh/fire water tank will be equipped with a st<strong>and</strong>pipe, which will ensure that thetank is always holding at least a 2 hour supply of fire water.There will be two potable water supply systems – one located in theprocess/administration/truck shop complex, <strong>and</strong> one at the camp. Potable water will besupplied from wells, <strong>and</strong> will be treated (chlorination <strong>and</strong> filtration) <strong>and</strong> stored in thepotable water storage tanks prior to delivery to various service points.Process Water Supply SystemThe overflow solutions from the concentrate thickener <strong>and</strong> tailings thickener will be reusedin the process circuit. The balance of the process water will be supplied from thewater treatment plant, which will treat water from the mine (underground water) <strong>and</strong>water collected from the plant site or from Brucejack Lake, as required. All process waterrequired will be distributed to the process plant from an 8.0 m diameter by 8.0 m highprocess water tank.AIR SUPPLYAir service systems will supply air to the following service areas:• Crushing circuit – high-pressure air will be provided by an air supply systemlocated underground for dust suppression <strong>and</strong> equipment services.• Dust collection at the transfer tower <strong>and</strong> SAG mill surge bin – high-pressure airwill be provided by dedicated compressors for dust suppression.• Flotation – low-pressure air for flotation cells will be provided by air blowers.• Filtration circuit – high-pressure air will be provided by dedicated aircompressors for filtration <strong>and</strong> drying.• Plant air service – high-pressure air will be provided by dedicated aircompressors for the various services.• Instrumentation – the service air will come from the plant air compressors <strong>and</strong>will be dried <strong>and</strong> stored in a dedicated air receiver.Pretium Resources Inc. 17-14 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!