13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.4 CONFIRMATION OF TENURESnowden is not qualified to provide legal comment on the mineral title to the Property,<strong>and</strong> has relied on the provided information. No warranty or guarantee, be it expressed orimplied, is made by Snowden with respect to the completeness or accuracy of thetenement description referred to in this document.4.5 ROYALTIES, FEES AND TAXESThe royalties applicable to the Project are as follows:• “Royalty” means the amount payable by the Owner, calculated as 1.2% of theNSR, with the following exemptions: gold: the first 503,386 oz produced from the Project silver: the first 17,907,080 oz produced from the Project.Snowden underst<strong>and</strong>s that the 1.2% NSR royalty is, at the time of this report, in favour ofFranco-Nevada Corporation.Pretium Resources Inc. 4-6 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!