13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 22.2Pre-tax NPV (5%) Sensitivity AnalysisNPV, $ million4,5004,0003,5003,0002,5002,0001,5001,0005000-30% -20% -10% 0% 10% 20% 30%% Change from base caseGold Price Silver Price Exchange Rate Capital Costs Operating CostsFigure 22.3 Figure 22.3 Pre-tax IRR Sensitivity Analysis90%80%70%60%IRR, %50%40%30%20%10%0%-30% -20% -10% 0% 10% 20% 30%% Change from base caseGold Price Silver Price Exchange Rate Capital Costs Operating CostsPretium Resources Inc. 22-6 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!