13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15.3 NET SMELTER RETURN MODELAMC generated the NSR values for mineral reserves using the parameters provided byTetra Tech <strong>and</strong> summarized in Table 15.1. The NSR for each block in the resource modelwas calculated as the payable revenue for gold <strong>and</strong> silver, less the costs of refining,concentrate treatment, transportation, <strong>and</strong> insurance.The metal price assumptions are US$1,350/oz gold <strong>and</strong> US$22/oz silver. Costs assumea Cdn$ to US$ exchange rate of 1.00.The NSR contributions for both flotation concentrate <strong>and</strong> doré were calculatedindividually, combined, <strong>and</strong> assigned to each block in the resource model.Note that the base case economic parameters for this study may vary from the NSRmodel inputs, due to additional metallurgical knowledge acquired through the duration ofthe study. AMC believes that the magnitude of any parameter variation has no materialimpact on the study findings.Pretium Resources Inc. 15-2 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!