RoleHeadCountMaintenance (72)Maintenance Superintendent 1Master Mechanic 2Mechanics 20Mill Wrights 8Apprentices/Labourers 12Welders 8Chief Electrician 1Lead Electrician 1Electricians 15Electrical Apprentices 4<strong>Technical</strong> Services (36)<strong>Technical</strong> Services Manager 1Manager Secretary 1Senior Geologist 1Production Geologist 2Geological Technologist 8Production Diamond Drillers 8Senior Engineer 1Engineer 3Mine Planning & Scheduling 2Surveyors 8Geotechnical Engineer 1Additional Hires (36)Total Personnel 349Figure 16.36 shows the manpower loading through the mine life. Years -1 <strong>and</strong> -2 areperiods of construction <strong>and</strong> early production (mill operations begin in month 18).Initial loading will primarily be provided by the contractor, with technical support providedby the Owner. During months 18 through 24, mine forces will transition from contractorto Owner.Pretium Resources Inc. 16-77 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!