13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

28.4 PIERRE PELLETIER, P.ENG.I, Pierre Pelletier, P.Eng., of Vancouver, British Columbia, do hereby certify:• I am the Division Managing Director of Rescan Environmental Services Ltd., an ERMcompany with a business address at #600 – 1111 West Hastings Street, Vancouver,British Columbia, V6E 2J3.• This certificate applies to the technical report entitled <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong><strong>Report</strong> on the Brucejack Project, Stewart, BC, dated June 21, 2013 (the “<strong>Technical</strong><strong>Report</strong>”).• I am a graduate of the University of Montana, Montana College of Mineral Science <strong>and</strong>Technology (Environmental Engineering, 1993). I am a member in good st<strong>and</strong>ing of theAssociation of Professional Engineers <strong>and</strong> Geoscientists of British Columbia, License#27928. My relevant experience is an environmental engineer with 20 years ofexperience in mining <strong>and</strong> the environment. Over the last 15 years, I have managedseveral environmental <strong>and</strong> social impact assessments. I have also permitted treatmentplants <strong>and</strong> mine closure plans, led due diligences <strong>and</strong> environmental audits <strong>and</strong> I havebeen the “Qualified Person” for environmental <strong>and</strong> social aspects of several preliminaryeconomic assessments, prefeasibility <strong>and</strong> feasibility studies. I am a “Qualified Person”for the purposes of National Instrument 43-101 (the “Instrument”).• My most recent personal inspection of the Property was August 7, 2012 for one day.• I am responsible for Sections 1.9, 20.0 (except 20.1.4, 20.1.5, <strong>and</strong> 20.1.7), 25.5 (except25.5.1), 26.6 (except 26.6.1), 27.8 (except 27.8.1 <strong>and</strong> 27.8.2) <strong>and</strong> 28.4 of the <strong>Technical</strong><strong>Report</strong>.• I am independent of Pretium Resources Inc. as defined by Section 1.5 of theInstrument.• I have no prior involvement with the Property that is the subject of the <strong>Technical</strong> <strong>Report</strong>.• I have read the Instrument <strong>and</strong> the sections of the <strong>Technical</strong> <strong>Report</strong> that I amresponsible for has been prepared in compliance with the Instrument.• As of the date of this certificate, to the best of my knowledge, information <strong>and</strong> belief,the sections of the <strong>Technical</strong> <strong>Report</strong> that I am responsible for contains all scientific <strong>and</strong>technical information that is required to be disclosed to make the <strong>Technical</strong> <strong>Report</strong> notmisleading.Signed <strong>and</strong> dated this 25 th day of June, 2013 at Vancouver, British ColumbiaOriginal document signed <strong>and</strong> sealed byPierre Pelletier, P.Eng.Pierre Pelletier, P.Eng.Division Managing DirectorRescan Environmental Services Ltd., an ERM companyPretium Resources Inc. 28-6 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!