13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 16.21Transfer Conveyor from Crusher to Main ConveyorFigure 16.22Conveyor from Decline to MillThe main conveyor belt speed of 1 m/s, along with the expected air speed of 4 m/s downthe decline will provide a combined speed of 5 m/s. This speed was assessed asreasonable in terms of keeping dust lifted from the belt to a minimum. Table 16.17summarizes conveyor parameters.Table 16.17Conveyor ParametersConveyor Width Length SpeedInclineAngle(°)Transfer 42 in (1 m) 55 ft 7 in (16.940 m) 197 ft/min (1 m/s) 8.00Main 42 in (1 m) 2,149 ft (654.981 m) 197 ft/min (1 m/s) 8.53Pretium Resources Inc. 16-56 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!