13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Primary Grind/Regrind SizesConcentrate Grade (g/t) Recovery/Extraction (%)Au Ag Au AgGravity Tailing - 4.68 103 55.7 91.4Leach on Gravity Tailing - - - 80.9 68.7Head - 1.70 7.68 - -GF42/Composite SU-32B **Flotation Concentrate P80 109 µm 4.71 382 93.1 90.8Gravity Concentrate P80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!