13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 13.17Cumulative Stage GRG versus Grind Size for Gold <strong>and</strong> SilverAccording to the GRG/GRS test results, Knelson conducted simulations to determine thegold recovery from a centrifugal gravity concentration/intensive leaching circuit <strong>and</strong> froma gravity concentration/tabling circuit. Total gold recovery by a centrifugal gravityconcentration/intensive leaching circuit was estimated in a range from 39 to 71%depending on the capacity of centrifugal concentrators <strong>and</strong> gold occurrence (native goldor electrum). When using a gravity concentration/tabling circuit, the expected goldrecovery would be between 32 <strong>and</strong> 65%. The simulation results are summarized in Table13.20.Table 13.20 Gravity Concentration Modelling Results (2012)EquipmentFeed toGravity(t/h)CirculationLoadTreated(%)ConcentratingCycle Time(min)GravityRecovery(% total Au)GravityConcentrate(kg/d)(g/t)Centrifugal gravity concentrate upgrading by acacia reactor, assuming gold is present as native goldXD20 40 11 15 46 1,920 12,445XD30 80 21 20 56 2,520 11,500QS40 140 37 30 63 2,976 10,8572 x QS40 280 74 30 69 5,952 5,9652XQS48 365 97 30 71 6,240 5,863Centrifugal gravity concentrate upgrading by tabling, assuming gold is present as native goldXD20 40 11 15 38 1,920 10,168table continues…Pretium Resources Inc. 13-28 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!