Figure 16.20CrusherThe 42 in wide belting on the transfer conveyor will carry material from the crushing areato the main conveyor at a speed of 1 m/s <strong>and</strong> will be positioned at a 90° angle to themain conveyor. The ore on the transfer conveyor will move up, past a magnet that willremove any tramp iron, depositing this iron into a waiting bin (see Figure 16.21).The main conveyor will move at a rate of 1 m/s transporting approximately 225 t/h of oreup the decline tunnel to the mill. The main conveyor will exit the decline tunnel throughthe portal structure where the 335 hp drive unit will be located. It will continue on fromthe portal to the mill through an enclosed, heated, rectangular gallery. The gallerystructure will be elevated, continuing at a grade of 15% from the portal structure to themill, allowing for traffic underneath (see Figure 16.22).Pretium Resources Inc. 16-55 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!