The process plant will consist of the following:• primary crushing underground• a conveying system for crushed ore• primary grinding <strong>and</strong> gravity concentration• rougher/scavenger flotation• bulk flotation concentrate regrinding <strong>and</strong> gravity concentration• cleaner flotation• gravity concentrate smelting to produce doré• flotation concentrate dewatering, bagging, <strong>and</strong> load out• tailings disposal to the tailings impoundment or to the underground mine forbackfilling.The simplified flowsheet for the operation is shown in Figure 17.1.Pretium Resources Inc. 17-3 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!