13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AreaDimension(height x width (alongtrend) by length)(m)Trend/Plunge ofExcavationDesignFactorof Safety Lifespan SupportPowder Magazine 7.1 by 14.1 by 6.4 152/01 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS(shotcrete only required if rehab will not be practical due to installed infrastructure).Cable bolts:Walls: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacingBack: 5.0 m length, bulbed str<strong>and</strong>, 2.5 m square spacingRefuge Station<strong>and</strong> Offices4.6 by 15 by 5.2 062/01 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS(shotcrete only required if rehab will not be practical due to installed infrastructure).Warehouse 5.5 by 27 by 5.5 270/01 2 LOM Galvanized, resin-grouted rebar (or equivalent); 1.8 m length; 1.75 m square spacing.Welded wire mesh, 100% coverage on back <strong>and</strong> walls, coated with minimum 2" SFRS(shotcrete only required if rehab will not be practical due to installed infrastructure).Notes:LOM = life of mine assumed 20 to 25 years; SFRS = steel fibre reinforced shotcretePretium Resources Inc. 16-35 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the Brucejack Project, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!