13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

28.8 COLM KEOGH, P.ENG.I, Colm Keogh, P.Eng., of Vancouver, British Columbia, do hereby certify:I am a Principal Mining Engineer with AMC Mining Consultants (Canada) Ltd with abusiness address at Suite 202, 200 Granville Street, Vancouver, British Columbia, V6C1S4.This certificate applies to the technical report entitled <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong><strong>Report</strong> on the Brucejack Project, Stewart, BC, dated June 21, 2013 (the “<strong>Technical</strong><strong>Report</strong>”). I am a graduate of the University of British Columbia (BASc Mining Engineering, 1988).I am a member in good st<strong>and</strong>ing of the Association of Professional Engineers <strong>and</strong>Geoscientists of British Columbia, License #37433. My relevant experience isapproximately 20 years in the mining industry, specifically underground base metal <strong>and</strong>precious metal operations in Canada <strong>and</strong> Europe. I am a “Qualified Person” for thepurposes of National Instrument 43-101 (the “Instrument”).My most recent personal inspection of the Property was October 24, 2012 for one day. I am responsible for Sections 1.6, 1.7, 15.0, 16.0 (except 16.5, 16.6, 16.9 <strong>and</strong> 16.10),21.2.2, 25.3, 26.4 (except 26.4.1 <strong>and</strong> 26.4.2), 27.9, <strong>and</strong> 28.8 of the <strong>Technical</strong> <strong>Report</strong>.I am independent of Pretium Resources Inc. as defined by Section 1.5 of theInstrument.I have no prior involvement with the Property that is the subject of the <strong>Technical</strong> <strong>Report</strong>.I have read the Instrument <strong>and</strong> the sections of the <strong>Technical</strong> <strong>Report</strong> that I amresponsible for has been prepared in compliance with the Instrument.As of the date of this certificate, to the best of my knowledge, information <strong>and</strong> belief,the sections of the <strong>Technical</strong> <strong>Report</strong> that I am responsible for contains all scientific <strong>and</strong>technical information that is required to be disclosed to make the <strong>Technical</strong> <strong>Report</strong> notmisleading.Signed <strong>and</strong> dated this 25 th day of June, 2013 at Vancouver, British ColumbiaOriginal document signed <strong>and</strong> sealed byColm Keogh, P.Eng.Colm Keogh, P.Eng.Principal Mining EngineerAMC Mining Consultants (Canada) LtdPretium Resources Inc. 28-10 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!