13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

21.0 CAPITAL AND OPERATING COSTS21.1 CAPITAL COST ESTIMATEThe total estimated initial capital cost for the design, construction, installation, <strong>and</strong>commissioning of the Project is $663.5 million, <strong>and</strong> includes all direct costs, indirectcosts, Owner’s costs, <strong>and</strong> contingency. A summary breakdown of the initial capital cost isprovided in Table 21.1Table 21.1Summary of Initial Capital CostsMajorAreaArea DescriptionCapital Cost($ million)Direct Costs11 Mine Site 32.721 Mine Underground 174.531 Mine Site Process 80.132 Mine Site Utilities 23.733 Mine Site Facilities 43.734 Mine Site Tailings 3.535 Mine Site Temporary Facilities 10.236 Mine Site (Surface) Mobile Equipment 14.384 Off Site Infrastructure 69.1Subtotal Direct Costs 451.891 Indirect Costs 125.098 Owner’s Costs 22.399 Contingencies 64.4Total Initial Capital Costs 663.5Note: Numbers may not add due to rounding.21.1.1 PURPOSE AND CLASS OF ESTIMATEPURPOSEThe purpose of this capital cost estimate is to advance the Project toward EPCMexecution, commissioning, <strong>and</strong> operations.CLASS OF ESTIMATEThis estimate is a Class 4 feasibility cost estimate prepared in accordance with thest<strong>and</strong>ards of the AACE. There was no deviation from the AACE’s recommended practicesin the preparation of this estimate.Pretium Resources Inc. 21-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!