13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The unit cost estimates are based on the LOM ore production <strong>and</strong> a mine life of 22 years.The currency exchange rate used for the estimate is 1:1 (Cdn$:US$). The operating costfor the Project has been estimated in Canadian dollars within an accuracy range of±15%. A summary of the overall operating cost is presented in Table 21.3. The costdistribution is illustrated in Figure 21.1.Table 21.3Overall Operating CostAreaPersonnelUnit Operating Cost($/t milled)Mining * 316 ** 93.18Processing 95 18.16Material Re-h<strong>and</strong>ling *** Contract 0.07G&A 43 25.47Surface Services 78 16.53Backfilling 6 2.10Water Treatment 4 0.95Total 542 156.46Notes:*Average LOM mining cost including crushing cost <strong>and</strong> cement cost for backfill; if excluding the oremined during preproduction, the estimated unit cost is $94.40/t**316 workers during year 1 to 14 <strong>and</strong> then reduce to 167 workers at the end of the mine life.***Material re-h<strong>and</strong>ling cost is the LOM average cost, which will occur in year 1 only. The operationis assumed to be contracted with approximately eight workers required.Figure 21.1Overall Operating Cost DistributionPretium Resources Inc. 21-10 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!