MANAGEMENT PROCEDURESThe EPCM contractor <strong>and</strong> the Mine Manager will develop a comprehensive set of projectprocedures, in conjunction with the Owner. These procedures will outline therequirements for the execution of the administrative activities, as well as the Owner,EPCM contractor rights, Mining contractor rights, authorities, <strong>and</strong> obligations to theProject.The procedures will include:• project organization, key names, <strong>and</strong> communication procedures• reporting requirements including project systems, project meetings, minutes,<strong>and</strong> a communications matrix• identification of the division of responsibilities among the Project stakeholdersusing a responsibility matrix format• risk management procedures• project data management, format, <strong>and</strong> distribution/filing requirements ofproject correspondence <strong>and</strong> documentation• cost management <strong>and</strong> accounting procedures• drawing <strong>and</strong> specification preparation including numbering, revision tracking,<strong>and</strong> transmittal procedures• document control procedures• equipment <strong>and</strong> materials procurement procedures• project scheduling requirements, tools, formats, <strong>and</strong> frequency of delivery• project accounting methods including cost reporting <strong>and</strong> forecasting systems• construction contract procedures including bidding <strong>and</strong> awarding the work• site administration procedures including camp administration rules• site security• field engineering• safety procedures• quality assurance expectations• site <strong>and</strong> office personnel rules <strong>and</strong> regulations• emergency site procedures <strong>and</strong> contact information• construction temporary facilities (power, water, offices, <strong>and</strong> camp)• site housekeeping <strong>and</strong> hazardous waste management• mechanical completion expectations including lock-out procedures• commissioning proceduresPretium Resources Inc. 24-4 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!