Figure 18.1Brucejack Overall Site LayoutE 430000 E 440000 E 450000 E 460000 E 470000N37SecurityGatehouseN 6262500Mill Site <strong>and</strong> PortalKnipple GlacierTracked VehicleAccess RouteNew Access RoadBowserLake37N 6252500Valley ofKing BypassHigh VoltageTransmission LineExistingAccess RoadBowserAirstripBowserRiverKnippleTransferStation <strong>and</strong> CampN 6242500Metres0 3000 6000 9000Pretium Resources Inc. 18-3 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the Brucejack Project, Stewart, BC