• vendors’ instrumentation packages• gold room operations.An automatic sampling system will collect samples from selected product streams fordaily metallurgical accounting <strong>and</strong> operation optimization.Particle size-based computer control systems will be used to maintain the optimum grindsizes for the primary grinding <strong>and</strong> rougher/scavenger concentrate regrinding circuits.Particle size analyzers will provide the main inputs to the control system.Online Sample AnalysisThe plant will rely on the on-stream or in-stream particle size analyzer <strong>and</strong> variousflowrate <strong>and</strong> solid density meters for process control. The analyzer <strong>and</strong> meters willanalyze the various slurry streams in the circuit. The on-stream particle size monitor willdetermine the particle sizes of the hydrocyclone overflows in the primary grinding circuit<strong>and</strong> regrinding circuit. A sufficient number of samples will be taken in order to controlhydrocyclone overflow particle size <strong>and</strong> optimize the grinding circuit operations. Specificsamples that will be taken for metallurgical accounting purposes include the flotationfeed to the circuit, the final tailings, the final concentrate sample, <strong>and</strong> occasionally themiddling products. These samples will be collected on a shift-basis <strong>and</strong> will be assayedin the assay laboratory.Remote MonitoringCCTV cameras will be installed at various locations throughout the plant, including theprimary crushing facility, the conveyor discharge point, the SAG mill surge feed conveyer,the SAG <strong>and</strong> ball mill grinding area, the flotation area, the regrind area, the paste plant,the gold room, the concentrate h<strong>and</strong>ling building, <strong>and</strong> the tailings h<strong>and</strong>ling facilities. Thecameras will be monitored from the plant control room. Fuel storage facilities will beremotely monitored by level controls <strong>and</strong> CCTV cameras.17.2 ANNUAL PRODUCTION ESTIMATEThe process plant will generate two products: gold-silver doré <strong>and</strong> gold-silver bearingconcentrate. The annual metal production shown in Table 17.2 has been projectedbased on the mining production plan outlined in Section 16.0 <strong>and</strong> the metallurgicalperformance outlined in Section 13.0. Based on the LOM annual average, the processplant is estimated to produce approximately 4,300 kg of gold <strong>and</strong> 1,500 kg of silvercontained in doré, <strong>and</strong> 42,000 t of gold-silver bearing flotation concentrate. On average,the flotation concentrate will contain approximately 135 g/t gold <strong>and</strong> 1,028 g/t silver.The arsenic content of the flotation concentrates to be shipped to the smelter(s) isexpected to be marginally higher than the penalty thresholds outlined by most smelters<strong>and</strong> will require further review.Pretium Resources Inc. 17-17 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!