13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 13.18 Metallic Gold Test Results – Individual Samples (2009-2010)SampleIDScreen TylerMeshGrade (g/t) Distribution (%)Grade (g/t) Distribution (%)Sample Screen TylerAu Ag Au Ag Mass ID Mesh Au Ag Au Ag MassSU-4 +150 1.91 1.0 9.4 4.1 8.6 SU-25 +150 2.63 15.0 9.0 10.7 7.3-150 1.74 2.2 90.6 95.9 91.4 -150 2.08 9.8 91.0 89.3 92.7Total 1.75 2.1 100.0 100.0 100.0 Total 2.12 10.2 100.0 100.0 100.0SU-5 +150 2.99 29.3 11.5 3.8 4.2 SU-27 +150 2.70 0.5 7.5 2.5 2.5-150 1.02 32.7 88.5 96.2 95.8 -150 0.86 0.5 92.5 97.5 97.5Total 1.10 32.6 100.0 100.0 100.0 Total 0.91 0.5 100.0 100.0 100.0SU-6A +150 9.25 50.6 21.8 4.2 4.7 SU-32A +150 6.49 15.1 14.2 4.7 4.9-150 1.62 56.9 78.2 95.8 95.3 -150 2.02 15.7 85.8 95.3 95.1Total 1.98 56.6 100.0 100.0 100.0 Total 2.24 15.7 100.0 100.0 100.0SU-6B +150 100.1 94.0 73.7 27.1 3.8 SU-32B +150 8.28 51.0 38.1 4.7 6.5-150 1.43 10.1 26.3 72.9 96.2 -150 0.94 73.1 61.9 95.3 93.5Total 5.23 13.3 100.0 100.0 100.0 Total 1.42 71.7 100.0 100.0 100.0SU-10 +150 2.11 2.1 11.4 2.0 4.1 SU-32C +150 10.9 9.0 37.1 22.0 10.4-150 0.70 4.3 88.6 98.0 95.9 -150 2.15 3.7 62.9 78.0 89.6Total 0.76 4.2 100.0 100.0 100.0 Total 3.06 4.2 100.0 100.0 100.0SU-19 +150 1.65 3.0 4.6 3.2 4.4 SU-33 +150 22.6 29.6 59.6 7.8 9.0-150 1.57 4.2 95.4 96.8 95.6 -150 1.52 34.9 40.4 92.2 91.0Total 1.57 4.1 100.0 100.0 100.0 Total 3.42 34.4 100.0 100.0 100.0SU-21A +150 0.64 4.3 3.7 2.0 3.7 SU-36A +150 2.12 9.5 15.4 7.9 9.4-150 0.64 8.2 96.3 98.0 96.3 -150 1.21 11.4 84.6 92.1 90.6Total 0.64 8.1 100.0 100.0 100.0 Total 1.30 11.2 100.0 100.0 100.0SU-21B +150 22.0 2.5 34.8 3.0 8.0 SU-36B +150 0.69 7.9 12.3 20.4 9.9-150 3.58 6.9 65.2 97.0 92.0 -150 0.54 3.4 87.7 79.6 90.1Total 5.05 6.5 100.0 100.0 100.0 Total 0.55 3.8 100.0 100.0 100.0Pretium Resources Inc. 13-25 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the Brucejack Project, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!