13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

maximum number of samples was kept small in the second search pass to prevent singleextreme grades influencing the block estimates at a great distance.The interpolation was controlled by:• minimum/maximum numbers of composites: West Zone: 8/20 per block (2/8 for pass 2) VOK: 6/16 per block (2/6 for pass 2)• discretisation: 1 by 1 by 1 (indicator kriging)• maximum number of composites per hole: 10• search ellipse: West Zone: 50 m by 50 m by 50 m (150 m by 150 m by 150 m for pass 2) VOK: 50 m by 50 m by 20 m (150 m by 150 m by 60 m for pass 2).14.10.3 HIGH-GRADE DOMAINS - PROBABILITYThe proportion of the higher-grade mineralization was estimated into each block <strong>and</strong>used to combine the two estimates in the determination of the overall block grade. Forexample, if a block had a probability of 5% high grade then the final block grade wouldcombine 95% of the low-grade estimate with 5% of the high-grade estimate. Theinfluence of the high-grade population above the 95 percentile is therefore greatlyrestricted.An indicator estimate was run at the population threshold for gold <strong>and</strong> silver (5 g/t Au<strong>and</strong> 50 g/t Ag for VOK, <strong>and</strong> 5 g/t Au <strong>and</strong> 300 g/t Ag for West Zone), using all of the datawithin the mineralized high-grade domains.Estimation for VOK <strong>and</strong> West Zone was into the small-scale discretized blocks used forthe high-grade population estimates. The resultant probabilities were re-blocked intoparent blocks the same size of those used for the lower-grade population estimates.The same domains <strong>and</strong> boundary conditions applied to the high-grade <strong>and</strong> low-gradepopulations were used for the probability estimate. Probability for gold <strong>and</strong> silver wereinterpolated using 1.5 m composites. Estimation parameters were established from thevariography analysis <strong>and</strong> used a single search pass only to prevent spreading theprobability estimate too far in all areas except VOK.In VOK there has been a significant increase in drilling <strong>and</strong> the use of a single search forthe probability resulted in over smoothing of the estimate. As a result a two pass searchwas used with the first search kept very tight to prevent over smoothing in well informedareas. The second search was set similar to the single search used for the other areas.The maximum number of samples was also reduced in the first search pass <strong>and</strong> themaximum number of composites per drillhole was reduced.Pretium Resources Inc. 14-15 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!