21.1.9 DESIGN BASISThe following items were referenced during preparation of this estimate:• equipment list <strong>and</strong> process flow sheets provided by Tetra Tech• site layout drawings• equipment data sheets• quantity take-offs for civil bulk materials• quantity take-offs for concrete, steel, architectural, HVAC, piping <strong>and</strong> electrical,instrumentation/controls provided by Tetra Tech• costs for preproduction mining <strong>and</strong> mining equipment provided by AMC• quantities <strong>and</strong> costs for tailings, water management, waste rock, <strong>and</strong>geotechnical design provided by BGC.21.1.10 PLANNING BASIS – EXECUTION STRATEGYThe project execution plan (PEP) has been considered in the preparation of this capitalcost estimate.Key elements of the PEP are described in Section 24.0.21.1.11 COST BASISThis section describes the methods <strong>and</strong> sources used to determine material, labour, <strong>and</strong>subcontract pricing. The section is organized to be consistent with the Level 2 Areaheadings.LABOUR RATE DEVELOPMENTThe construction schedule <strong>and</strong> labour cost are based on shifts of 10 h/d for 7 d/wk. Thework rotation has been assumed as 3-weeks-on/1-week-off.A blended labour rate of $110/h was calculated for the Project <strong>and</strong> used throughout theestimate. The rate is based on a typical crew consisting of a lead h<strong>and</strong>, certifiedtradesman, uncertified tradesman, skilled labourer, <strong>and</strong> helper.The blended labour rate of $110/h includes:• base rate• vacation <strong>and</strong> statutory holiday pay• fringe benefits <strong>and</strong> payroll burdens• overtime <strong>and</strong> shift premiumsPretium Resources Inc. 21-5 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!