Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 21.7Summary of Process Operating CostDescriptionLabourForceAnnual Cost($)Unit Cost($/t Milled)Labour ForceOperating Staff 18 2,057,000 2.29Operating Labour 38 3,163,000 3.53Maintenance Labour 39 3,487,000 3.89Subtotal Labour Force 95 8,707,000 9.71Major ConsumablesMetal Consumables - 2,750,000 3.06Reagent Consumables - 842,000 0.94Subtotal Major Consumables - 3,592,000 4.00SuppliesMaintenance Supplies - 1,669,000 1.86Operating Supplies - 589,000 0.66Power Supply - 1,732,000 1.93Subtotal Supplies - 3,990,000 4.45Total (Process) - 16,289,000 18.16All process operating costs are exclusive of taxes, permitting costs, or other governmentimposed costs unless otherwise noted. The following items have been included in theestimate:• labour force requirements, including supervision, operation, <strong>and</strong> maintenance,salary/wage levels based on current labour rates in comparable operations inBC. The annual salary includes holiday <strong>and</strong> vacation pay. A benefit burden of30% for the labour includes Registered Retirement Savings Plans (RRSPs),various life <strong>and</strong> accident insurances, extended medical benefits, BC MedicalService Plan (MSP), Canadian Pension Plan (CPP), Employment Insurance (EI),Workers' Compensation Board (WCB) insurance, tool allowance, <strong>and</strong> otherbenefits.• mill liner <strong>and</strong> mill grinding media consumptions, estimated from the Bondgrinding media/liner consumption estimate equations <strong>and</strong> the Tetra Techdatabase; the steel ball <strong>and</strong> mill liner prices based on the quotations from thepotential suppliers.• maintenance supply costs, based on approximately 7% of major equipmentcapital costs.• laboratory supplies, building maintenance <strong>and</strong> other costs, based on TetraTech’s in-house database <strong>and</strong> industry experience.• reagent costs, based on the consumption rates from test results <strong>and</strong> quotedbudget prices or the Tetra Tech database.• service vehicle costs, including fuel consumables <strong>and</strong> maintenances, areincluded in the surface service cost estimates.Pretium Resources Inc. 21-14 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!