13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MAJOR AREA 98 – OWNER’S COSTSItems included in the Owner’s costs are the Project team (salaries), travel, recruitment,training, human relations, community relations, health <strong>and</strong> safety, security,environmental considerations, permits/licenses/fees, insurance, legal/audits, satelliteoffice, communications, <strong>and</strong> orientation.The total allowance for Major Area 98 – Owner’s Costs is $22.3 million.MAJOR AREA 99 – CONTINGENCYA contingency allowance was established for each area/discipline/task depending on thelevel of engineering effort <strong>and</strong> risk.The largest single contingency allowance is for mining at $19.1 million, followed byarchitectural ($8.0 million), power line ($7.5 million), <strong>and</strong> bulk earthworks ($6.2 million).The total allowance for contingency for the Project is $64.4 million.21.2 OPERATING COST ESTIMATE21.2.1 SUMMARYThe total LOM average operating cost for the Project is estimated at Cdn$156.46/t oremilled, which includes costs for:• mining• process• material re-h<strong>and</strong>ling in Year 1 for the stockpiled ore produced during preproduction• general <strong>and</strong> administrative (G&A)• surface services• backfill, including paste preparation• water treatment.The operating costs exclude sustaining capital costs, off-site costs (such as shipping <strong>and</strong>smelting costs), taxes, permitting costs, or other government imposed costs, unlessotherwise noted.A total of 542 personnel are projected to be required for the Project, including an averageof 316 personnel for mining operations, 95 personnel for process, 43 personnel for G&A,78 personnel for surface services, <strong>and</strong> 10 personnel for the backfill plant <strong>and</strong> watertreatment plant. The mining personnel requirement is expected to gradually reduce afterYear 15 to approximately 167 personnel in Year 22.Pretium Resources Inc. 21-9 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!