16.2.3 STOPE DESIGNAMC used the MSO module from the Datamine Studio 3 mine planning software packageto produce conceptual stope shapes. Key design parameters used in MSO aresummarized in Table 16.2. The conceptual stope shapes were refined as necessary inorder to minimize the amount of planned dilution <strong>and</strong> to meet practical miningconstraints.Table 16.2Stope Design ParametersVOK ZoneWest ZoneParameterUnitsSt<strong>and</strong>ard Weathered *SillPillar St<strong>and</strong>ard Weathered *SillPillarNSR Cut-off $/t 180 180 180 180 180 180Level Spacing m 30 30 30 30 30 30Stope Span m 15 10 10 15 10 10Minimum Mining Width m 3 3 3 3 3 3Minimum Waste Pillar Width m 5 5 5 5 5 5Minimum Footwall Dip degrees 60 60 60 60 60 60Minimum Hanging Wall Dip degrees 60 60 60 60 60 60Note:*Refers to stoping in weathered material immediately below the surface crown pillar. Weatheredmaterial extends 10 to 50 m below surface.Individual areas meeting cut-off grade were evaluated against access development coststo determine economic viability, before including them in the mineral reserves. The LOMplan includes 782 stopes in the VOK Zone <strong>and</strong> 177 stopes in the West Zone. Figure 16.7<strong>and</strong> Figure 16.8 are long-section views showing stope shapes generated by the MSOprocess.Pretium Resources Inc. 16-9 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!