13.0 MINERAL PROCESSING AND METALLURICALTESTING13.1 INTRODUCTIONSeveral testing programs were completed to investigate the metallurgical performance ofthe Brucejack mineralization, including recent test work conducted between 2009 <strong>and</strong>early 2013, <strong>and</strong> historical test work conducted between 1988 <strong>and</strong> 1990 for thefeasibility study by CESL Limited (CESL) (1990).After 2009, metallurgical test work was conducted on mineral samples from the VOKZone, the West Zone, <strong>and</strong> adjacent mineralization deposits such as the Galena Hill Zone<strong>and</strong> the Gossan Hill (R8) Zone. This study focuses on the mineralization of the VOK Zone<strong>and</strong> the West Zone.Gold <strong>and</strong> silver are the key economic metals in the mineralization of the Project. Themetallurgical test programs conducted after 2009 include head sample characteristics,gravity concentration, gold/silver bulk flotation, cyanidation, <strong>and</strong> the determination ofvarious process related parameters. Early test work, after 2009, focused on developingthe flowsheet of gravity concentration, bulk flotation, <strong>and</strong> flotation concentratecyanidation. This test work also examined the metallurgical responses to the flowsheetof gravity concentration followed by whole ore leaching. Later test work concentrated onthe gravity-flotation concentration flowsheet.Comprehensive metallurgical test work programs were conducted in 2012 <strong>and</strong> 2013 tosupport the feasibility study; this test work focused on assessing the metallurgicalperformance of the West Zone <strong>and</strong> the VOK Zone mineralization. The main testingprograms are summarized in Table 13.1. Although cyanidation is not proposed for thisstudy, the results from the test programs are also summarized in this section.Table 13.1Major Metallurgical Testing ProgramsYear Program ID Laboratory ** Gravity Flotation Grindability Cyanidation Others2013 1208011 Inspectorate √ √ √ √ √2012 11489 Hazen - - √ - -2012 KRTS20734-A Knelson √ - - - -2012 MS1399 Met-Solve √ - - - -2012 - Pocock - - - - √2012 12012 JZM √2012 1106811 Inspectorate √ √ √ √ √table continues…Pretium Resources Inc. 13-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!