13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 21.11Surface Services Operating CostsSurface ServiceLabourForceTotal Cost($/a)Unit Cost($/t milled)Surface Service Labour ForceSurface Service Personnel 78 6,599,000 7.36Subtotal Labour Force 78 6,599,000 7.36Surface Service ExpenseSmall Vehicles/Equipment - 100,000 0.11Potable Water <strong>and</strong> Waste Management - 320,000 0.36Supplies - 150,000 0.17Building Maintenance - 300,000 0.33Building Heating - 400,000 0.45Road Maintenance - 1,320,000 1.47Avalanche Control - 375,000 0.42Power Line Maintenance - 164,000 0.18Mobile Equipment - Maintenance - 1,400,000 1.56Mobile Equipment - Fuel - 3,375,000 3.76Airstrip Instrumentation Maintenance - 20,000 0.02Off-site Operation Expense - 300,000 0.33Subtotal Expense 8,224,000 9.17Total 78 14,823,000 16.53Pretium Resources Inc. 21-19 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!