collect waste water during maintenance operations. A floor hardener will be applied toconcrete surface on high-traffic areas. Steel inserts will be embedded into the concretein areas where tracked vehicles will be driven. A 5 t overhead crane will service thisfacility.FIRST AIDThe first aid <strong>and</strong> emergency response facility will include parking for a fire truck <strong>and</strong> anambulance. A helicopter pad will be located close to the facility for any medicalevacuation requirements.ADMINISTRATIONThe administration will be constructed on the second floor above the mine dry.CONVEYINGConveyors will be vendor-supplied systems <strong>and</strong> will include all structural support frames,trusses, bents, <strong>and</strong> take-up structures. Elevated conveyor systems will be supported onvendor supplied steel trusses spanning between steel bents on concrete spread footings,or supported from building trusses.CAMP FOR CONSTRUCTION PHASE AND OPERATIONSThe current exploration camp includes a kitchen <strong>and</strong> dormitories, <strong>and</strong> can accommodate180 people. Two dormitories will be demolished to allow for construction of the new millpad, reducing the current camp capacity to 120. The new permanent camp willaccommodate 330 people <strong>and</strong> will include an additional kitchen, <strong>and</strong> recreation <strong>and</strong>exercise facilities. The new camp <strong>and</strong> remaining exploration camp will have a combinedcapacity of 450 people during construction. Once construction is complete, thepermanent camp will be refurbished for use during operations.ON-SITE EXPLOSIVES STORAGETwo pre-fabricated Sea Can-type structures will house the explosives storage <strong>and</strong> will belocked at all times to prevent unauthorized access. This storage facility will be located1.5 km northeast of the mill building. Access to the explosives storage will be by road<strong>and</strong> the facility will be controlled by a locked gate.DETONATOR MAGAZINE STORAGEA pre-fabricated Sea Can-type structure will house the detonator magazine storage <strong>and</strong>will be locked at all times to prevent unauthorized access. This facility will be located500 m southeast of the explosive storage facility, <strong>and</strong> 1.0 km from the mill building.Access to the detonator magazine storage will be by road, <strong>and</strong> the facility will becontrolled by a locked gate.Pretium Resources Inc. 18-31 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!