13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16.4.4 LOM PRODUCTION SCHEDULEFull 2,700 t/d production is effectively achieved in Year 2, the fourth year of projectactivity.Figure 16.14 illustrates the ramp-up to full production tonnage as the various blocks arebrought into production.Table 16.7 is a summary of projected LOM production tonnes <strong>and</strong> grade.Figure 16.15 shows the LOM split of production by development, slashing, <strong>and</strong> stoping.Pretium Resources Inc. 16-23 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!