13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 13.26 Gravity Concentrate Grade versus Head Grade – Silver (2012)Variability Test Work (2010 to 2011)In 2011, Inspectorate conducted seven variability tests on various samples, whichincluded three samples from the West Zone <strong>and</strong> four samples from the Galena Hill Zone.The tests studied the metallurgical responses of these samples to Flowsheet C,developed from the composite samples. The test results are summarized in Table 13.30.Table 13.30 Variability Test Results (2010 to 2011)Grade (g/t) Recovery/Extraction (%)Au Ag Au AgGrind SizeGF26/Composite GH2 – Head 4.9 52.9 100.0 100.0 Primary Grind Size:Primary Gravity Concentrate 1,808 183 36.4 0.32P80 125 µm;Regrind Size:Flotation Concentrate 16.5 302 62.0 98.6P80 7 µmSecondary Gravity Concentrate 1,116 2,650 51.5 8.1Intensive Cyanide Leaching - - 93.6 95.6Cyanide Leaching - - 61.3 64Overall Recovery - - 91.0 71GF27/Composite SU98– Head 73.3 205 100.0 100.0 Primary Grind Size:Primary Gravity Concentrate 11-959 186 33.2 0.3P80 123 µm;Regrind Size:Flotation Concentrate 214 556 66.0 99.1P80 7 µmSecondary Gravity Concentrate 13-281 11,323 79.1 27.7Intensive Cyanide Leaching - - 95.3 95.8Cyanide Leaching - - 97.2 66.9Overall Recovery - - 99.0 79.0table continues…Pretium Resources Inc. 13-44 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!