13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

28.7 SABRY ABDEL HAFEZ, PH.D., P.ENG.I, Sabry Abdel Hafez, Ph.D., P.Eng., of Vancouver, British Columbia, do hereby certify:• I am a Senior Mining Engineer with Tetra Tech WEI Inc. with a business address at #800– 555 West Hastings Street, Vancouver, British Columbia, V6B 1M1.• This certificate applies to the technical report entitled <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong><strong>Report</strong> on the Brucejack Project, Stewart, BC, dated June 21, 2013 (the “<strong>Technical</strong><strong>Report</strong>”).• I am a graduate of Assiut University (B.Sc Mining Engineering, 1991; M.Sc. in MiningEngineering, 1996; Ph.D. in Mineral Economics, 2000). I am a member in goodst<strong>and</strong>ing of the Association of Professional Engineers <strong>and</strong> Geoscientists of BritishColumbia, License #34975. My relevant experience is in mine evaluation. I have morethan 19 years of experience in the evaluation of mining projects, advanced financialanalysis, <strong>and</strong> mine planning <strong>and</strong> optimization. My capabilities range from theconventional mine planning <strong>and</strong> evaluation to the advanced simulation-basedtechniques that incorporate both market <strong>and</strong> geological uncertainties. I have beeninvolved in the technical studies of several base metals, gold, coal, <strong>and</strong> aggregatemining projects in Canada <strong>and</strong> abroad. I am a “Qualified Person” for the purposes ofNational Instrument 43-101 (the “Instrument”).• I did not complete a personal inspection of the Property.• I am responsible for Sections 1.12, 22.0, <strong>and</strong> 28.7 of the <strong>Technical</strong> <strong>Report</strong>.• I am independent of Pretium Resources Inc. as defined by Section 1.5 of theInstrument.• I have no prior involvement with the Property that is the subject of the <strong>Technical</strong> <strong>Report</strong>.• I have read the Instrument <strong>and</strong> the sections of the <strong>Technical</strong> <strong>Report</strong> that I amresponsible for has been prepared in compliance with the Instrument.• As of the date of this certificate, to the best of my knowledge, information <strong>and</strong> belief,the sections of the <strong>Technical</strong> <strong>Report</strong> that I am responsible for contains all scientific <strong>and</strong>technical information that is required to be disclosed to make the <strong>Technical</strong> <strong>Report</strong> notmisleading.Signed <strong>and</strong> dated this 25 th day of June, 2013 at Vancouver, British ColumbiaOriginal document signed <strong>and</strong> sealed bySabry Abdel Hafez, Ph.D., P.Eng.Sabry Abdel Hafez, Ph.D., P.Eng.Senior Mining EngineerTetra Tech WEI Inc.Pretium Resources Inc. 28-9 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!