13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.1 WORK COMPLETED BY SILVER STANDARDIn 2009, Silver St<strong>and</strong>ard began their first work on the Property following its acquisition.The 2009 program included drilling, rock-chip <strong>and</strong> channel sampling, <strong>and</strong> re-sampling ofhistorical drill core.During the 2009 field program, Silver St<strong>and</strong>ard collected a total of 1,940 drill coresamples from 25 historical drillholes stored on site, <strong>and</strong> sent them to ALS for analysis.The samples were sent to the ALS assay laboratory in Terrace for preparation, <strong>and</strong> thenforwarded to the ALS facility in Vancouver for analysis. Samples were analyzed for gold(30 g fire assay with atomic absorption (AA) finish) as well as 33 other elements by usingfour-acid digestion with inductively coupled plasma (ICP) analysis. The 2009 programalso included re-analysis of 941 pulp samples derived from historical drill core samples.These samples were also analyzed for gold <strong>and</strong> 33 other elements at the ALS facility inVancouver.During the 2009 field work program, 2,739 rock-chip <strong>and</strong> channel samples werecollected from surface outcrops. This sampling work was mostly done in target areasthat were drilled by Silver St<strong>and</strong>ard in 2009, with samples generally collected alongnorth-south oriented lines that corresponded to the surface traces of some of the 2009drillholes. Specifically, rock-chip <strong>and</strong> channel sampling were completed at the GalenaHill, Bridge, SG, <strong>and</strong> Mammoth zones (where drilling was carried out in 2009), as well asat the Hanging Glacier Zone (where historical surface sampling had identified rocksenriched in gold <strong>and</strong> silver). The surface samples were analyzed for gold <strong>and</strong> 33 otherelements.A total of 17,846 m of diamond drilling was completed in 37 holes during the 2009 fieldseason.In 2010, a total of 33,400 m of diamond drilling was completed in 72 holes.6.2 PREVIOUS FEASIBILITY STUDIES AT THE PROPERTYCorona Corporation (Corona) completed a feasibility study on a proposed undergroundmine with decline access for the Sulphurets Project (West <strong>and</strong> R-8 Zones only) in 1990.A total operating cost of $145 per ton was estimated based on a 350 ton per day millfacility for processing, along with a capital cost of $42.7 million <strong>and</strong> a 6.7% pre-tax returnat a price of US$400/oz gold <strong>and</strong> US$5/oz silver. The study concluded that higher metalprices must be realized before a production decision could be taken.The reader is cautioned that the information above, mentioned in the 1990 CoronaSulphurets Project <strong>Feasibility</strong> <strong>Study</strong> is no longer relevant, is not NI 43-101 compliant, <strong>and</strong>should not be relied upon.Pretium Resources Inc. 6-5 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!