13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

28.21 S. (KUMAR) SRISKANDAKUMAR, M.A.SC., P.ENG.I, S. (Kumar) Srisk<strong>and</strong>akumar, M.A.Sc., P.Eng., of Vancouver, British Columbia, do hereby certify:• I am a Senior Geotechnical Engineer with BGC Engineering Inc. with a business addressat Suite 800 – 1045 Howe Street, Vancouver, British Columbia, V6Z 2A9.• This certificate applies to the technical report entitled <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong><strong>Report</strong> on the Brucejack Project, Stewart, BC, dated June 21, 2013 (the “<strong>Technical</strong><strong>Report</strong>”).• I am a graduate of the University of British Columbia (M.A.Sc., 2004). I am a member ingood st<strong>and</strong>ing of the Association of Professional Engineers <strong>and</strong> Geoscientists of BritishColumbia, License #33087. My relevant experience is nine years as a consultantinvolved with mine development <strong>and</strong> operation. I am a “Qualified Person” for thepurposes of National Instrument 43-101 (the “Instrument”).• I did not complete a personal inspection of the Property.• I am responsible for Sections 26.5.6, 27.4, <strong>and</strong> 28.21 of the <strong>Technical</strong> <strong>Report</strong>.• I am independent of Pretium Resources Inc. as defined by Section 1.5 of theInstrument.• I have no prior involvement with the Property that is the subject of the <strong>Technical</strong> <strong>Report</strong>.• I have read the Instrument <strong>and</strong> the sections of the <strong>Technical</strong> <strong>Report</strong> that I amresponsible for has been prepared in compliance with the Instrument.• As of the date of this certificate, to the best of my knowledge, information <strong>and</strong> belief,the sections of the <strong>Technical</strong> <strong>Report</strong> that I am responsible for contains all scientific <strong>and</strong>technical information that is required to be disclosed to make the technical report notmisleading.Signed <strong>and</strong> dated this 25 th day of June, 2013 at Vancouver, British ColumbiaOriginal document signed <strong>and</strong> sealed byS. (Kumar) Srisk<strong>and</strong>akumar, M.A.Sc., P.Eng.S. (Kumar) Srisk<strong>and</strong>akumar, M.A.Sc., P.Eng.Senior Geotechnical EngineerBGC Engineering Inc.Pretium Resources Inc. 28-23 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!