process facilities such as warehouse, truck shop/wash bay, mine dry/wicket<strong>and</strong> lamp room, first aid/emergency response, cold storage/laydown,administration building, assay laboratory, metallurgical laboratory,maintenance shop/tool crib, <strong>and</strong> covered parking• power distribution including: power distribution from the mine site substation to all the facilities process control <strong>and</strong> instrumentation communication systems.Additionally, an operating gatehouse is currently located at the intersection of Highway37 <strong>and</strong> the Project access road. This gatehouse will continue to operate during theconstruction phase <strong>and</strong> mine life of the Project.At the Bowser Airstrip, project facilities <strong>and</strong> infrastructure will include upgrades to thecurrent airstrip.At the Knipple Transfer Station, project facilities <strong>and</strong> infrastructure will include:• a transfer station• on site fuel storage• potable water• a septic field• a laydown area• a communications system• a 30-person camp• a temporary covered storage.Pretium Resources Inc. 18-2 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!